Loan Kit Turnover Check

Enter each kit's code, how many are available, and the turnaround minutes after each return, then add the pickup and return times for every loan. Press “Check kit shortages” to see each kit's peak demand, how many extra kits are needed at most, and every shortage interval.

Kits

1–12 kits. A code is 1–24 characters, starting with a letter or digit; duplicates are not allowed. Available count 0–1000, turnaround 0–120 minutes.

Loans

0–60 loans. Loan codes are unique and the kit must be one already listed above; pickup and return use HH:MM (same day from 00:00, 24:00 only as a return endpoint), quantity 1–1000.

The sample is fixed placeholder data (kit K with 4 available, A borrows 2 from 00:10–00:30, B borrows 3 from 00:30–00:50, 10-minute turnaround; short by 1 during 00:30–00:40); press “Check kit shortages” to compute it.